Week 7

in the work shop this week joe and i continued in mounting the rear wheel supports in order for the team to be able to attach the braking system onto the 2 rear wheels of the racer.

Seren was able to compile the best collection of the brakes we have in order to have the best condition pads and lever system.

Mike started to cut the metal required to brace the gravity racer for the extra strength needed to stop the excess chassis flex the team was facing.

Jack and mason where absent this week.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s