Workshop Week 6

this week saw large development for the group. adam and joe mounted the steering system and front wheels and attached the rear wheels. we also created a plan to develop the strength of the chassis. jack finished the hub assembly which allowed the wheels to be mounted seven cleaned up our steering system after removing…

Workshop Week 4

adam and Joe continued work on seat mounting and roll cage Jack cut the steering metal seren bent the steering system into the correct shape. mason created the steering wheel and brake lever

Workshop Week 5

Adam and Joe finalised the role over structure and began development of further Jack developed his steering system further due to limited attendance from other team members little else was achieved

Workshop Week 3

Adam and Joe finished the chassis and seat rails. then started to add in the roll cage. Jack started to develop our steering system Mike and mason looked into the best brakes we could use Seren chopped out hub mounts for the wheels

Workshop Week 2

this week the team continued our workshop development. Adam and Joe started to assemble the frame base and weld the chassis Jack and serene removed all the brakes and cables from our donor bikes.  

Workshop Week 1

this week the team set about their individual roles as decided in the workshop. Adam, Jack and Joe set about measuring and cutting the base frame section. Mike and Mason stripped and re greased the best 14mm wheel sets